The final applications of non-skid paint on the port and starboard sides and the the entire bow area. I think I will ad some around the mast area at a later date but want to see where that will go based on activity around the mast. I will let everything cure for a week or two. This is a huge milestone that closes the chapter on an entire redeck and recore. This boat used to be covered in teak decking which was attached with 2,000 screws. This allowed water to migrate down into the core that is sandwiched between the two layers of fiberglass and provide strength without too much weight. My deck after sitting under cover for a year had dried out enough for me to realize I had a very spongy deck which I almost put my foot through. Very bad.
The entire deck had to be removed. With all the teak gone, the thought was to inject epoxy into the 2000 little holes and let it stiffen back up. This would add a lot of weight up high but I didn't think it would be that bad. After the first $100 worth of epoxy was injected and I had only covered a 2 square foot area, this was proving to be a bad plan. A little research indicated the only way to do the job properly was to cut the entire
There were still some voids that were filled from the top by injecting epoxy
No comments:
Post a Comment