Finished up some small piece varnish in the basement this weekend. Finalized the chain locker cover which is a trapezoid piece of plywood that is stained on one side and has dry erase paint on the other. It can be inserted either way depending on need. I also removed the mounting brackets for a couple of coats of varnish. The cabin table was also cleaned up and sanded lightly with a coat of varnish.
I did get on the boat long enough to drill a couple of holes in the engine compartment to run the tri sensor cable through and around to where the NMEA 2000 backbone is located. I have ordered the other tridate connector and when that come sin make the final connections.
I drilled and potted the holes fro the two rear cleats that mount on to the transom deck and the holes fro the stern anchor rope deck pipe. I should be able to mount all of those this week.
No comments:
Post a Comment